Penmann has completed a complex HVAC upgrade at Danone Nutricia's Liverpool-based production site, supplying a fully engineered ventilation and climate control system engineered to meet strict hygiene and production standards. The project encompassed the complete lifecycle delivery of cutting-edge HVAC systems across non-production, Medium Care (MC) and High Care (HC) https://bookmarkssocial.com/story20584591/the-penmann-team-completes-major-hvac-upgrade-for-nutricia-s-liverpool-site-to-align-with-the-fsi-development-programme